
HCA PLAZA MEDICAL CENTER
1000 tons, 2017
The 3-storey building had over 2000+ drawings. This project involved lots of coordination work with the back-feed area steel and with an adjacent existing building.
The 3-storey building had over 2000+ drawings. This project involved lots of coordination work with the back-feed area steel and with an adjacent existing building.