IAD 350 DATA CENTER

2200 tons, 2025

This six-sector data center building features a steel structure weighing over 2,200 tons. It is covered with panels, supported by embeds, with beams running around the perimeter. The building is separated by expansion joints. The exterior includes a substantial amount of galvanized steel to support the generator, which is enclosed by a screen wall with posts and beams.

Scroll to Top